|
NC Missouri | Wondering what is the proper way to install the system plumbing. It arrived without instructions and Raven's web site diagram is designed for a sprayer system. Obviously, the solution is injected after the anhydrous metering system (using Raven Cold-Flow) followed by the "mixer" before it tee's to the two manifolds. Do I need any valves in the system for "flushing" or can I simply plumb straight from the supply tank to the N-serve metering pump and from the pump straight to the injection point?
I was supplied with a special hard-plastic hose for plumbing but wonder what is used for nipples to hook-up the hose? Is there suppose to be a check-valve or "spray nozzle" in the system?
Any words of wisdom would be appreciated. Thank you
Dan | |
|